Problems existing in the use of double-girder cranes
In recent years, with the rapid development of the construction industry, the use of double-girder cranes has become more and more common. However, in the process of using the double-girder crane, if the operator does not follow the relevant operating rules, it will not only lose the function of the lifting equipment, but also shorten the operation time of the relevant components. I shared what should be paid attention to in the safe operation of electric hoists. The following are the problems that should be paid attention to in the operation of double-girder cranes sorted out by gantry crane manufacturers:
1. Before using the lifting equipment, you should first confirm whether the hydraulic oil is full through the mailbox liquid level window according to the rules. If the ratio is lower than the standard, make up to full. In the process of refueling, it is recommended to use the refueling filter to refuel. Do not mix impurities such as oil, water, etc. in different pictures.
2. After 250 hours of operation, the oil filter element should be stacked and checked. If necessary, replace or clean the filter element.
3. Before the double-girder crane leaves the factory, all kinds of valves in the hydraulic system should be tested as a whole, and the operator should check it once when using it. Basically, the pressure and flow are specified to see if there is any sign of being touched.
4. Every half month, the oil discharge port at the bottom of the hydraulic oil tank should be cleaned to remove moisture and impurities. Maybe replace all hydraulic oil after 1 year 2000 hours. Of course, if the oil does not deteriorate, the oil change period can be extended appropriately. If it is in a particularly harsh working environment, it is necessary to appropriately shorten the replacement cycle.
5. Various components, especially the hydraulic system, must not have attached dirt. Be sure to clean up dust or oil in time after operation.
All in all, we must pay attention to the above details, and hope that we can operate the double-girder crane in accordance with the relevant rules, safety is very important!
Heavy-duty industrial robotsEuropean industrial craneEuropean Crane PartsSmart Material Handling Option
Hotline:400-617-0817
E-Mail:hees@heescranes.com
Address:No. 132, Ruiyuan Road, Beijing-Tianjin Science and Technology Valley Industrial Park, Wuqing District, Tianjin
Copyright©Hechi Hoisting Machinery (Tianjin) Co., Ltd.
What is the price of the crane, which one is the best European crane, what is the quotation of Konecranes crane, Tianjin crane consultation hotline: 400-617-0817
Powered by 企航动力技术支持